00662
Effective Date/Time
2000-10-28
Definition: This optional field contains the effective date/time, which can be included for file-level action specified. It is the date/time the originating system expects that the event is to have been completed on the receiving system. If this field is not present, the action date/time should default to the current date/time (when the message is received).
Length≤26
2 components
| 1 | O | - | time of an event | |
| 2 | O | - | degree of precision |