0472

TQ conjunction ID

Introduced in v2.4· hl7· universal· 3 values

HL7-defined code system of concepts specifying that a second timing specification is to follow using the repeat delimiter. Used in HL7 Version 2.x messaging in the TQ1 segment.

OID & Vocabulary Information

THO Canonical URL (v2.0.0)
http://terminology.hl7.org/CodeSystem/v2-0472
Table OID
2.16.840.1.113883.12.472
Codesystem OID (v1)
2.16.840.1.113883.18.300
Value Set OID
2.16.840.1.113883.21.316
Binding
universal
Expansion
All codes from codesystem
UTG Code Table
prev version
Used In Data Elements

Used In Data-Type Components1

3
A
Asynchronous
THO: Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.
C
Actuation Time
THO: It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).
S
Synchronous
THO: Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.

Also Referenced In(1)

3 codes